TG Construction Home
TG Construction Projects
TG Construction LEED Projects
Information for TG Construction Subcontractors
Contact TG Construction


Office and Lab Tenant Improvements
S5 High-end Secure Office Space
Thermo Vacuum Chamber

Office and Lab Tenant Improvements

Test Operations Meeting Center
After Action Review Meeting Center (AARMC)
Test Support Area Lounge
Virtual Manufacturing & Simulation (VMS)
Joint Use Display Room (JUDR)
White Cell/MapEx/SimEx
2nd Floor Lab Area
C4ISR Integration and Test Area (2nd Floor)
West Annex
West Wing First Floor Offices
Cost: $4.1 Million

East High Bay
14,000 s. f. high bay server room with epoxy coated floors, 2 new AHU's, new UPS room and substation.
Cost: $4.6 Million

TOMC
5,500 s.f. high end 240 auditorium with state-of-the-art projection systems.
Cost: $2.8 Million



back to top

S5 High-end Secure Office Space

Build-out 4 floors (56,000 s.f.) high-end secure office space in an existing core and shell building. Construction included all new mechanical and electrical service by providing a rooftop chiller with fan coil units throughout, as well as new electrical switchgear and metering systems. The project included an extensive security system of badge readers and cameras, as well as STC rated conference rooms and high security D.O.D. rooms. An STC rated presentation room with an extensive VTC system was constructed on the first floor to facilitate approximately 125 guests.





back to top

Thermo Vacuum Chamber

Negotiated construction management contract. Facility is a poured-in-place concrete structure to house a $12 million thermo-vacuum testing chamber to be used for satellite manufacturing. Construction included installation of a 20-ton bridge crane on the roof trusses so the chamber installation could proceed concurrently with the completion of the building.

Structure was 110' x 112' x 80' high with no interior floor diaphragms. Approximately 40,000 s.f., square feet, built to house the world's largest mailbox space test chamber.