|
|
 |
 |
 |

ATO B31 Storage Upgrade Project
Biosciences Facility Improvement Project
Other Projects
|
 |
ATO B31 Storage Upgrade Project
General construction services in support of upgrading the ATO B31 storage facility. This is a facility regulated by FDA's Good Management Practice (GMP) rules. The upgrade involves tripling the H-rated storage area (from approximately 3,000 to over 10,000 square feet), providing separate storage rooms for different classes of materials and adding a sampling and dispensing facility. In addition, the upgrade also includes equipping the new H-Room with a dedicated, high throughput ventilation system. The project is currently in the design and permitting phase. We provide input to the facility design on issues related to constructability and construction management. Prepare detailed cost estimates and a CPM schedules for the work. The estimate will be used in establishing baseline for project progress tracking. We are required track the project by physical progress, cost and schedule monthly. We provide preconstruction services, such as ordering long lead items, securing execution contracts and ensuring timely start of the construction. We also provide construction management, including, site organization and site construction facilities, work logistics, health & safety oversight, etc. All activity in this building is conducted in a fashion that minimizes the risks of interrupting or impacting operation of the facility or jeopardizing its compliance status.
back to top
|
 |
Biosciences Facility Improvement Project
Renovation of an existing 2-story 26,000 s.f. biotech facility (lab and office) for the purpose of mitigating and correcting CBC and CFC code issues.
Project included: renovation of three lab areas and adjacent office and administration space; addition of heating and ventilation system; construction of new support structures; and installation of a secondary containment piping and collection system.
back to top
|
 |
Other Projects
Santa Monica Medical Center
Structural Earthquake Repairs
Santa Monica, California
Repairs for a nine-story hospital building. Project involved concrete, structural steel and over 50,000 lf of epoxy injections. Included extensive tenant improvements, mechanical modifications, seismic upgrades and earthquake repairs. Cost: $9.5 Million, Completed: 1996
Baxter Highland Division
New Installation and Renovation
Los Angeles, California
Phase 2 of a 12-phase project. Included new refrigerated clean rooms, equipment installation and relocation, support apparatus that involved extensive structural steel fabrications and erection in existing historic wooden bowstring truss structure. Cost: $4.2 Million, Completed: 1995
Baxter Scientific Products Div.
Seismic Upgrade
Irvine, California
Seismic upgrade for a biological products warehouse and adjoining administration area. Included steel moment frame construction, installation of over 5,000 epoxy bolts, and seismic bracing to over 160,000 s.f. of roof structure. Cost: $1.8 Million, Completed: 1995
Long Beach Community Hospital
Heart Surgery Suites
Long Beach, California
Complete renovation and expansion of the Heart Surgery Suites and associated floors. Cost: $1.5 Million
Northridge Medical Center
Remodel of Laboratory Areas
Northridge, California
Remodel of the laboratory areas (GI, Nuclear, Radiology) as a phased project.
Cost: $750,000
back to top
|
|
 |

|