TG Construction Home
TG Construction Projects
TG Construction LEED Projects
Information for TG Construction Subcontractors
Contact TG Construction


M4 High-Bay Annex
S2 / S3 Steel High-Bay Annex
Other Projects

M4 High-Bay Annex

New facility, satellite manufacturing and assembly. Construction of a 10,500 s.f. high bay, class 100,000 clean room facility. Structural steel frame with metal siding, roof equipment platforms, and 20-ton overhead bridge crane with an 82' span. Ceiling height of clean room is 75'. Building is supported on engineered fill with cast-in-place concrete piles. Cost: $5.5 Million, Completed Feb. 2002.




back to top

S2 / S3 Steel High-Bay Annex

Construction of a new 30,000 s.f. Steel High Bay Facility. Included the seismic upgrade of adjacent structure and the new construction of a class 10,000 clean room. Competetive bid, fast track schedule. Concurrent with Chamber Project. Cost: $12 Million, Schedule: 9 Months, Completed: 1998.



back to top

Other Projects

Air-Handling Unit Installation
Redondo Beach, California
Installation of seven new air-handling units on the roof of a low bay facility. The project involved new steel platform construction beneath the existing units while kept in operation. Cost: $2.5 Million, Completed: 1995

TRW MBE Labs
Redondo Beach, California
Build-out of 3,000 s.f. chip manufacturing lab, class 100. Cost: $2 Million, Completed 2000

TRW D-1 Thermal Oxidizer
Redondo Beach, California
Built thermal oxidizer plant for chip manufacturing plant. Cost: $2 Million, Completed: 1999

TRW D-1 Roof Canopy
El Segundo, California
Enclosed entire roof of building with steel canopy. Cost: $1 Million, Completed: 1998



back to top