Costa Pasta Manufacturing Expansion
M4 High-Bay Annex

Costa Pasta Manufacturing Expansion

46,000 s.f. expansion for a macaroni manufacturing operation, concrete tilt-up. Included seismic retrofitting of the existing facility, extensive below grade work and site work. Fast Track Schedule. Cost: $5 Million, Schedule: 12 Months, Completed: 1998



back to top

M4 High-Bay Annex

New facility, satellite manufacturing and assembly. Construction of a 10,500 s.f. high bay, class 100,000 clean room facility. Structural steel frame with metal siding, roof equipment platforms, and 20-ton overhead bridge crane with an 82' span. Ceiling height of clean room is 75'. Building is supported on engineered fill with cast-in-place concrete piles. Cost: $5.5 Million, Completed Feb. 2002.