Seismic Upgrade & West Annex Mezzanine
M4 High-Bay Annex
Building 86 New Main Lobby and Renovations

Seismic Upgrade & West Annex Mezzanine

In addition to the Tenant Improvements, TG installed a 12,000 s.f. mezzanine with approximately 28 concrete piles (3' x 22'deep). There is also a seismic upgrade to the existing building which is about 24 ea piles (same size) with columns and horizontal steel trusses supporting the building laterally.

"Now that we are winding down and within a week of completion on the Building 49 Phase 0 project, I wanted to thank you and your organization for giving the team and myself the opportunity to build such a great facility. I am very pleased and proud of the way the facility turned out and I know it will provide many years of reliable service. Thanks again." - Bruce Wight, Boeing


M4 High-Bay Annex

New facility, satellite manufacturing and assembly. Construction of a 10,500 s.f. high bay, class 100,000 clean room facility. Structural steel frame with metal siding, roof equipment platforms, and 20-ton overhead bridge crane with an 82' span. Ceiling height of clean room is 75'. Building is supported on engineered fill with cast-in-place concrete piles. Cost: $5.5 Million, Completed Feb. 2002.



back to top


Building 86 New Main Lobby and Renovations
Building 86 New Main Lobby and Renovations
Seal Beach, California
Design-Build from inception of the project to completion of construction. Intense schedule with high end construction. Cost: $350,000, Schedule: 1 Month, Completed: 1997

Payload Test Facility
El Segundo, California
25-feet deep pit and new clean-rooms in an existing building and computer room for space vehicle payload test facility. Cost: $3.8 Million, Completed: 1997


High-Bay
El Segundo, California
Structural steel, raised roof of high bay. Cost: $1.2 Million, Completed: 1996

Rearrange Commercial Electronics
El Segundo, California
New build-out of 10,000 square foot area, including new duct work, bridge-crane, and hepa-filter system. Cost: $1.2 Million, Completed: 1995

Seismic Upgrade
El Segundo, California
Structural steel seismic upgrade. Cost: $1 Million, Completed: 1995